Client: PETRONAS Carigali Iraq Holding BV - PCIHBV.
Project Description: Engineering, procurement, Construction & Commissioning of FCP Offsite Well Cluster 2 Facilities Including:
• 18’’ Trunk Line & 6’’ Flow Lines.
• Pig Launcher & Receiver.
• Multiphase Face Flow-Metering.
• Facilities Control System.
• Compact Substation & Over Head Transmission Lines.
• Field Instrument.
• Telecom System & Fiber Optic Cables.
• Power Distribution.
• Close Drain System.
• Chemical Injection System.
• Well Head Control Panels
• All Associated Tie - In Work to FCP Facilities.
Project Duration: 1 Year.
Value: 19,000, 000 USD.
Project Location: Republic of Iraq - Nasiriyah Town - Garraf Contract Area .